Name: Reno Sparks Convention Center West Plaza
Expansion
Description: Over excavation of approximately ¾
acre to bring the site down to an elevation matching
adjacent property. Construction included widening of
South Virginia St, relocation of a rockery wall, addition
of a new ADA ramp, Plaza concrete with tables, landscaping,
lighting, and a concrete wall. Alternate #1 was accepted
to add additional exit signage at the North parking
lots.
Contract Amount at Time of Completion:
$1,157,419
Completion Date: January 3, 2008
Client: Reno/Sparks Visitors Authority
|
 |
Project Name:
Bethel Church
Description: Complete restoration of a historic Reno building
on the National Register of Historical Landmarks. Built
in 1907, the building was virtually destroyed by fire
in 2004. Significant changes were required to bring the
7200 square foot building into compliance with current
building codes.
Contract Amount at Time of Completion:
$595,965
Completion Date: January 29, 2008
Client: Bethel AME Church and Bethel
Housing Development Corporation |
 |
Project Name:
VA ER Expansion
Description: 7000 sq ft addition to the Reno VA Hospital.
The addition required concrete foundations, site improvements,
relocation of 24” diameter active sewer main and
1.5” fiber optic lines. The project also required
the demolition of 7800 square feet of modular buildings,
street approaches, landscaping, and utilities to the modular
ER spaces. The addition was a new emergency area that
included new electrical with new a boiler, HVAC system,
plumbing, structural steel, acoustical ceilings, metal
studs and drywall, painting, new V.C.T tile flooring with
rubber base, coved sheet vinyl, and epoxy flooring; it
also included security doors, nurse call, and complicated
coordination of equipment and utility / Gas / Data Terminations.
Contract Amount at Time of Completion:
$4,444,881
Completion Date: March 12, 2008
Client: Department of Veterans Affairs |
 |
Project Name:
MSAT Simulator Addition
Description: 1500 square foot, single story CMU addition
to an existing building including associated earthwork.
The project involved a steel bar joist and steel decking
roof structure with ridged insulation and PVC roofing.
The building was constructed on a raised access floor
to allow cables to run underneath equipment. The site
security features include security doors, fencing, rock,
mulch, and vehicle traps. The project included exterior
electrical and communications upgrades and relocation
of existing main electrical and communication feeds.
Contract Amount at Time of Completion:
$715,835
Completion Date: June 30, 2009
Client: NAVFAC |
Quality, Responsiveness, Safety